Reventlouschule Kiel

About the object

The state capital of Schleswig-Holstein, Kiel, is tackling the problem of dilapidated and outdated school buildings with a multi-million investment programme. The Reventlouschule – a primary school in the Düsternbrook district of Kiel – is also benefiting from this. For example, a new school canteen has now been built, which will improve the open all-day programme. New school buildings – especially in the vicinity of existing schools – are always critical in terms of time. The construction process – especially towards the end – sometimes has to be juggled.

Section

Education & Daycare

Execution

2019

Building owner

Reventlou-Schule

Location

Kiel

Client

Tischlerei Peter Heuer

Lifting folding shutter with wooden surface

The new refectory is a single-storey structure clad in the typical local clinker brick. It thus fits in perfectly with the ensemble of existing school buildings. A floor-to-ceiling glazed building corner and a strongly projecting flat roof give the new building a modern look. The interior is also modern.

The walls are plastered white. All the fixtures are flush with the walls and have a light wood surface. This also includes the folding lift shutter from Baier.

Task: Unusual timing in the construction process

Baier’s high-quality, customised folding shutters are used to close the hatch between the kitchen and the school canteen. kitchen and school canteen. They ensure a food serving area that is as functional as it is appealing.

The closing of the food serving area of the Kiel primary school is implemented with the help of a folding lift shutter from Baier. It is operated by motor. An 18 mm birch multiplex board was used as the filling. The running rail, which is visible from the side, is silver anodised for a high-quality look.

The challenge in this project lay in the unusual sequence of the finishing trades. The lifting folding system frame was installed by Baier in the shell. – accordingly without a counter as the lower finish. The birch multiplex infill was fitted during assembly by the Peter Heuer joinery.

Console supports folding lift shutter

At the Reventlouschule, there was a gaping hole where the counter is normally already mounted as the lower end. The Baier fitters were therefore not allowed to install the folding lifting shutter at the bottom.

Instead of the classic installation, the system was hung freely in the opening with the help of a bracket. At the same time, the filling was installed. Only then did the other finishing trades follow. The flexibility of the installation gives the planners much-needed freedom when the schedule is once again critical.

But it was not only the fastening that had to be done differently than usual. The work also had to be particularly precise so that everything would fit later on. Baier’s experienced craftsmen mastered both challenges with flying colours. Today, the wall, the lifting folding system and the counter form a single unit.

If you would like to have both customised lifting and folding systems as well as a coordinated installation, please contact us. We will be happy to advise you.

Similar references

Research Institute Iris Adlershof

For the striking new building with a recessed glass foyer in the basement, the architects planned an expressive metal façade with functional folding shutters for the first and first floors.

More about the project

Realschule refectory

In addition to subject and technical competence, the educational focus of the Realschule Au in der Hallertau is above all on teaching social skills. For the best possible support of the learning process, the extension building offers spacious communal areas such as the light-flooded canteen with a Baier lifting folding system.

More about the project

Parish hall Merklingen

The new bakehouse not only keeps the tradition of baking bread together alive, but also sees itself - as in grandmother's day - as a place of community. Unlike back then, today a folding lift shutter from Baier can be used as an interior partition for a wide variety of purposes.

More about the project

Steigenberger Inselhotel

In the spacious outdoor area of the Steigenberger Inselhotel, a modern guest garden was created - a combination of self-service and service. Over a width of 5.20 m and a height of 3.50 m, the façade and thus the bar area can be opened.

More about the project

Residential house Dietersburg

Residential and agricultural farm buildings characterise the image of the community of Dietersburg in Lower Bavaria. Many are made entirely or partly of wood. Only at second glance does one recognise the new residential building with its modern wooden façade - and at third glance the windows inside, equipped with folding shutters by Baier.

More about the project

Educational House in Friedrichshafen

It is said that learning is a lifelong process. Educational centres support this idea from kindergarten onwards. What good ideas can achieve in combination with professional know-how becomes clear in the refectory of the Berg education centre. A Baier Hebefaltladen connects the kitchen and dining area in the food serving area.

More about the project

Friedrich-Schiller-Gymnasium Marbach

Baier supplied brightly coloured sliding shutters to match the school's colourful logo. The individual sliding shutters consist of extruded aluminium frame profiles filled with expanded metal. The movable shutters control light and shade as needed.

More about the project

Community kindergarten

In the Lower Bavarian district of Landshut, the municipal kindergarten in Hohenthann has received an extension that now provides additional childcare facilities. Floor-to-ceiling window fronts provide plenty of light in the group rooms. The Baier shading system is of particular importance here.

More about the project

Primary school Wermsdorf

The all-day operation brought the old school building of the primary school of the small community to its spatial capacity limit. But there was also little space available for the new building. The clever idea: thanks to Baier's lift-up folding shutter in front of the food counter, the dining hall becomes the school auditorium.

More about the project