Primary school Wermsdorf

About the object

Anyone living in Wermsdorf is well acquainted with historical buildings. The baroque Hubertusburg Castle dominates the small town east of Leipzig. The impressive complex replaced the former hunting lodge, a Renaissance building, from the 18th century onwards. Opposite is the primary school “Zur alten Post”. Until recently, the name provided information about the location: in the historic post office building. But the listed building was too small for a modern primary school with all-day operation.

Section

Education & Daycare

Execution

2018

Location

Wermsdorf

Client

Lautertal Hasert GmbH

The task: A modern new school building in historic surroundings

In 2017, the decision was made: The primary school would move into a new building right next to the old one. The rooms in the new building would continue to be used by the after-school care centre. The new building had to fit in in terms of design and space. At the same time, a school building was to be created that

  • establishes a relationship with the community.
  • meets the latest energy standards.
  • offers space for modern school operations with a kitchen and dining room as well as specialised classrooms.

The solution: a spacious multi-purpose room as a school canteen and assembly hall with a “shop window” facing the street

The new building consists of two structures, one behind the other, which are connected by a glass sluice. The new primary school is a zero-energy building. The classrooms are located in the rear, screened-off part of the building. In front, facing the street, are the specialist workrooms, the kitchen and a representative multi-purpose room. It opens up to the street with a wide window front. The generous opening creates a connection to the community.

The multi-purpose room is used by the children as a school canteen during everyday school life. On special occasions, it functions as an assembly hall. The flexible use means that the required space can be made available even when space is limited. At the same time, the dual use saves energy that would be necessary for the construction and operation of two rooms.

“Invisible” food servery with folding lift-up drawer in the wall panelling of the school canteen

To ensure that the daily lunch runs smoothly, there is a food counter between the kitchen and the school canteen. Outside meal times, it is closed by a customised folding lift shutter from Baier.

When the shutter is closed, only the discreet tray shelf under the opening indicates its function. The school canteen becomes the assembly hall. In order to make the food servery really “invisible” thanks to the folding lift shutter, the company commissioned with the extension relied on the know-how of the expert Baier. The company’s high-quality lift-up folding shutters have already proven themselves many times over as interior counter finishes.

Baier develops and manufactures each system according to the conditions on site and the planning idea – as was the case for the school canteen of the new primary school in Wermsdorf. The folding lift shutter was perfectly integrated into the wall cladding.

  • The system sits flush in the wall
  • For the filling, 8 mm thick white Trespaplate panels were invisibly screwed on – analogous to the wall cladding.
  • All visible aluminium parts were anodised silver (E6EV1).

Tailor-made lift-fold shutter system – adapted to the installation situation

The flush wall integration into the cladding allows undisturbed use as an assembly hall and creates an appealing impression – especially as the food servery is located in the immediate vicinity of the large window front.

When installing the folding lift shutter, it was necessary to respond to the low lintel height of the food counter in order to achieve an opening height of 2018 mm. For Baier, design adaptations are also part of the claim to support the design idea with customised products.

The standard system was slightly modified by removing the height adjustment on the fixed bearing. Stoppers and thus the trolley can now move further upwards.

The lift-fold shutter is operated via a dead man’s control. This guarantees maximum safety for school children and staff.

Intelligent product solution from Baier improves school operation

Speaking to the local press, headmistress Ines Reinert highlighted, among other things, the significant improvement brought about by the kitchen and the large school canteen in the school building: “Lunch was served in containers outside, but people always had to be divided into groups. That’s over now, because we have everything concentrated under one roof.”

How can we make your next project a little better? Contact us. We will be happy to advise you.

Similar references

Educational House in Friedrichshafen

It is said that learning is a lifelong process. Educational centres support this idea from kindergarten onwards. What good ideas can achieve in combination with professional know-how becomes clear in the refectory of the Berg education centre. A Baier Hebefaltladen connects the kitchen and dining area in the food serving area.

More about the project

Research Institute Iris Adlershof

For the striking new building with a recessed glass foyer in the basement, the architects planned an expressive metal façade with functional folding shutters for the first and first floors.

More about the project

Friedrich-Schiller-Gymnasium Marbach

Baier supplied brightly coloured sliding shutters to match the school's colourful logo. The individual sliding shutters consist of extruded aluminium frame profiles filled with expanded metal. The movable shutters control light and shade as needed.

More about the project

Community kindergarten

In the Lower Bavarian district of Landshut, the municipal kindergarten in Hohenthann has received an extension that now provides additional childcare facilities. Floor-to-ceiling window fronts provide plenty of light in the group rooms. The Baier shading system is of particular importance here.

More about the project

Primary school Wermsdorf

The all-day operation brought the old school building of the primary school of the small community to its spatial capacity limit. But there was also little space available for the new building. The clever idea: thanks to Baier's lift-up folding shutter in front of the food counter, the dining hall becomes the school auditorium.

More about the project

Luisenstift Grammar School

What doesn't fit is made to fit. But not by bungling and sacrificing quality, but by planning that takes the design wishes into account and finding quick solutions when the implementation threatens to fail. This is what Baier did with the folding sliding shutter for the new school cafeteria.

More about the project

University Landshut

Climate-friendly building is the order of the day with regard to climate change. In the European Union, 40 percent of energy consumption is accounted for by existing buildings, with air conditioning accounting for the largest share. When constructing new public buildings, high standards must be met, and rightly so.

More about the project

John Cranko School

At 90 x 36 metres, the new building of the John Cranko School winds its way up the steep slope with a height of 20 metres. Made of concrete, wood and glass, the building for the world-famous ballet school adapts to the urban and topographical conditions. Large window areas with sliding shutters flush with the façade provide sufficient privacy in the entrance area with maximum light.

More about the project

Peter and Paul Kindergarten

Sliding shutters create individual and distinctive building views and can be manufactured in different materials. For the St. Peter and Paul day care centre in Karlsruhe, the "arcade" was shaded with sun protection fabric in different warm yellow tones. The textile coverings are transparent, easy to clean and weather-resistant.

More about the project