Kasto was founded in 1844 and is one of the most traditional family-owned companies in Europe. Kasto can call more than 140 patents its own and employs more than 600 people with an average annual turnover of 100 million euros. Reason enough to also expand spatially. The go-ahead for the new building was given in March 2008, when the premises of the 1980 administration building became too small.

Architect

Grossman Group

Section

Industry

Execution

210

Location

Achern

Metalleinhausung Treppenturm

High bay as a stair tower

The new building impresses with its cubic-elegant form with partly floating storeys and a generous glass façade for light-flooded interiors. After several years of operation, the existing stair tower had to be renovated and provided with a full thermal insulation. In the course of this, the decision was also made that the stair tower should in future become the visual flagship of the company and represent a high rack made of expanded metal. In keeping with the company’s corporate identity, the orange-coloured concrete shell shimmers through under the perforated expanded metal from Baier and gives a glimpse of the interior.

Defying the wind forces

The existing stair tower, made of double-skinned concrete in a signal orange colour scheme, serves as an attachment for the multi-level steel substructure. The wind loads acting on a building increase with the height above ground, which is why the substructure is statically insufficient to support the final structure.

is statically insufficient to protect the final shell from wind loads and air draught. For this reason, an additional truss was incorporated into the system in the upper area of the tower. This provides the necessary stability for the structure and forms a crown-shaped termination towards the top. Both the calculation and the construction planning were carried out by Baier. The necessary verifications were carried out and an optimisation of the material consumption was achieved.

Duplex process for longer durability

The substructure was coated using a duplex process. Components that are double coated have a 1.2 to 2.5 times longer service life than components that are only single galvanised or coated. In this supplementary corrosion protection system, the parts are first galvanised and then single or multiple powder or wet coated. In this project, the substructure was glass bead blasted after galvanising and then powder coated. Glass bead blasting is an old process that was first used industrially in 1935. The versatile and inexpensive surface finishing serves not only to protect against corrosion but also to remove worn layers. Because glass beads are free of iron and chemically neutral, they can be used to process almost any material. It smoothes and densifies surfaces and gives a silky matt finish. This type of treatment can ensure the long-lasting and durable appearance of the substructure.

The duty is followed by the metal enclosure

After the visible substructure was fixed to the concrete walls, it was covered with the form-giving expanded metal made of aluminium in the colour DB 703 FS. The enclosure in the form of a translucent shell plays around the solid concrete core with a lightness that contrasts with the solidity of the rest of the building. The perforation in the metal fulfils not only the design component but also the requirements for ventilation and lighting. As an identity-forming element, Kasto’s orange logo was affixed to the façade in large letters on the street and courtyard sides. The rest of the building, including the window frames and façade panels, appears in a homogeneous anthracite, accentuated by the orange splashes of colour. The new cover of the stair tower turns it into corporate architecture, so to speak, by picking up on and emphasising Kasto’s recognition value and colours.

Fast assembly thanks to efficient processes

The expanded metal was cut to fit the substructure and the individual elements were welded together with support brackets. The elements were then fastened to the galvanised substructure with special stainless steel self-drilling screws. Due to the pragmatic connection, the assembly times could be reduced to a minimum.

Baier as a reliable partner in metal construction

The Renchen-based company is available for consultation when it comes to developing suitable concepts. Special designs are just as much a part of Baier’s repertoire as standard solutions. With millimetre precision, the metals can be brought into the desired shape and even assembled on site. Whether static or movable: with metal construction there are no limits to creativity and a mix of materials, for example in combination with wood, glass or stone, brings even more variety to the façade design. We are happy to accompany you in the early project phases and work out the optimal solution together with you.

Similar references

EMPL vehicle factory Zahna-Elster

The Tyrolean family-owned company EMPL has expanded its site in Zahna-Elster, Saxony, by adding an assembly hall and a customer centre. Customised folding sliding shutters made of expanded metal from Baier adorn the façade of the new cubic building.

More about the project

Bertrandt Company

"The best solution for every customer" is the claim with which Bertrandt meets the different requirements at 52 locations. Thus, the competences of the company Baier from Renchtal fitted perfectly into the concept - high demands on aesthetics, functionality and design, combined with a long-standing repertoire of experience in the field of standard and special solutions.

More about the project

Hilite Germany Headquarters

For the clean room production of the company's largest production site, an experienced metal builder was engaged to manufacture so-called "material locks". Baier supplied 4 vertical sliding windows, 2 of which are connected together, for production under clean room conditions.

More about the project

Hall conversion Vogt-Plastik GmbH

The company Vogt-Plastic is committed to high-quality recycled plastics. It is also taking a sustainable approach to expanding its spatial resources - converting instead of building new. The ridge of an old hall is opened up by a skylight from Baier - new offices are created underneath.

More about the project

HTO Härtetechnik

Growth means change - the success story of HTO Härtetechnik proves this impressively. It's good when the industrial halls at the location can also be changed. Even better when new windows, light bands and doors create bright and open rooms with a pleasant working atmosphere.

More about the project

Kasto mechanical engineering

Conceived as a place of encounter, the new Kasto headquarters convinces with its content-related design and expressive architecture. The stair tower in the form of a high rack by Baier is emblematic of the world market leader for metal saws and long goods storage systems, both in its shape and in the material metal.

More about the project

Basement foundation hall

With the newly built hall for assembly and repair work, Keller Grundbau GmbH strengthens its presence in Renchtal, Baden. Baier, a veteran in façade design, windows and doors, was allowed to work for Keller Grundbau GmbH.

More about the project

Simma Electronic Headquarters Egg

The striking façade of wood and folding sliding shutters made of dark metal makes the new company headquarters of Simma Electronic in Vorarlberg, Austria, an eye-catcher. 100 folding sliding shutter systems with large-area perforated sheet metal infill from Baier enable a pleasant working climate on hot days - and still provide daylight in the interior rooms.

More about the project

Steurer Metall

Clear! For the new company headquarters of the modern locksmith's shop, metal was the choice for the façades and also for the interior fittings. Not necessarily clear: who could meet the high demands of the professionals? In Baier, they found a partner on the same wavelength and with the right product solutions.